Client: Ogilvie
Size of Contract: £2.7m
Sector: SFS & Drylining
Duration of Project: 65 Weeks
Services provided:
Acoustic & Thermal Insulation Applications
Metal Stud Partitioning
Acoustic & Architectural Ceiling Systems
Steel Frame Systems
Drywall Installation
Metal Frame Ceiling Systems
Grid & Tile Ceiling Systems
Project Description
We delivered this project on behalf of Ogilvie Construction Ltd helping create a 315 bed Student accommodation which is now a landmark point of Glasgow’s City Centre. Cameron Drywall delivered both the External Steel Frame System (SFS) & the internal partitions and ceilings package on NCR. The challenges we faced on this project developed as a direct result of the COVID-19 Pandemic and working during a pandemic created its own list of issues. We managed to successfully manoeuvre our way through the COVID-19 restrictions and work within a safe environment.